GOe3 Charger

GOe3 Charger

Advertisements

Pioneers Charge Ahead with First Universal EV Highway

GOe3 shares plans for its Coast-to-Coast Electric Highway and the elaborate marketing engine its technology will support

AZ-based GOe3 plans coast-to-coast EV HighwayMESA, Ariz. (June 21, 2013)– An Arizona based start-up is on a mission to change the way American consumer’s drive… and the way that business market to them.

This year, GOe3 broke ground on a project to install a 1000-unit Electric Highway, powered by Eaton, which will make fuel-free coast-to-coast travel a reality for all EV drivers. Home to branches of I-10, I-8, and I-40, Arizona was selected as a key hub for the project’s initiation.

GOe3 Fast Charge Stations are addressing many hurdles previously presented by Electric Vehicle travel:

Efficiency: Offering a Level 3/2 combination unit which includes a Level 3 DC fast charger and a Level 2 (70 amp) charger, these stations can charge an electric vehicle in aslittle as 20 minutes, getting road travelers back on the road quickly. Many currently installed electric charging stations provide only a Level 2 (30 amp) charging mechanism, requiring at least a few hours to charge an electric vehicle.

100% Chargeability: While most Level 3 fast chargers will only charge up to a maximum of 80%, GOe3 Charging Stations offer the option to “top-off” to a 100% charge. EV drivers can expect to pay up to $6 to fully charge a Nissan Leaf.

Compatibility: Many current EV Charging Stations can only support certain electric vehicle brands or plugs. GOe3 Charging Stations are designed to adapt with evolving EV technology.

Adaptability: Built for the future, GOe³ Charging Stations are designed toadapt to changing technologies in electric vehicle construction, able to be easily upgraded without the use of heavy machinery.

Profitability: Designed around aunique and systematic marketing engine, GOe3 Charging Stations present profit opportunities for host locations (with no fees to install), surrounding businesses, and GOe3, ensuring a sustainable business model.

Quick Installation: Thanks to its unique and compact design, GOe3 Charging Stations require no architectural/building permits from the city (only electrical permits), speeding up the process of securing locations and installing units.

“As EVs are becoming more affordable to the general public, this is the ideal time to help build the infrastructure to support range confidence,” said Bruce Brimacombe, CEO of GOe3.

But the EV Highway is just the beginning. Made possible by the inclusion of a network of interactive, wi-fi enabled monitors affixed to every GOe³ EV Fast Charge Station, the company is planning the launch of an elaborate marketing engine, fed by visitors to its EV Highway pit stops.

In partnership with a universal savings card technology, GOe3 will be tracking the buying habits of American consumers, and using this information to funnel only the most appropriate advertisements and savings coupons from businesses and products that truly meet the needs of each individual.

“Individual consumers are tracked only as a number, without any personal identifying information attached to the data,” explained Brimbacombe. “Because we know that #555 enjoys pizza, prefers environmentally friendly products, and regularly purchases tickets to sporting events, we can help businesses reach their target markets more effectively.”

Focused on educating the public while the infrastructure is installed, GOe3’s next launch is a documentary film and reality television show that will involve and inform Americans on the future viability of Electric Vehicles.

###

Media Contact:
Ashley Torresala
619-796-6693
ashley (at) propelcommunications {dot} com

GOe³ Unveils Electric Vehicle (EV) Fast Charge Station in Picacho Peak

Grand Opening Celebration:

Saturday, December 8, 2012 – 12pm-5pm
Bowlin Travel Centers – Picacho Peak Plaza

MESA, Ariz. – (November 28, 2012) Electric Vehicle travel between Tucson and Phoenix is now possible, with a 20-minute pit-stop at Bowlin Travel Centers Picacho Peak Plaza. Arizona based start-up, GOe³ is celebrating the 1st of 26 planned publicly accessible Electric Vehicle (EV) Fast Charge Stations in Arizona, blazing the trail of a 1000 unit Electric Highway that will make fuel-free coast-to-coast travel a reality by 2015.

Team with Secretary of State Ken BennettGOe³ Fast Charge Stations are addressing almost every hurdle previously presented by Electric Vehicle travel:

Efficiency: Offering a Level 3/2 combination unit which includes a Level 3 DC fast charger and a Level 2 (70 amp) charger, these stations can charge an electric vehicle in aslittle as 20 minutes, getting road travelers back on the road quickly. Many currently installed electric charging stations provide only aLevel 2 (30 amp) charging mechanism, requiring at least a few hours to charge an electric vehicle.

Compatibility:  Many current EV Charging Stations can only support certain electric vehicle brands or plugs. GOe³ technology supports most all modern electric vehicles, including the Ford Focus EV, Tesla, and Nissan Leaf.

Adaptability: Built for the future, GOe³ Charging Stations are designed toadapt to changing technologies in electric vehicle construction, able to be easily upgraded without the use of heavy machinery.

“This is about dollars and cents,” says Bruce Brimacombe, CEO of GOe³, who will be speaking at the Grand Opening Event. “Regardless of any environmental agenda, electric vehicle travel is an inevitable future because Americans are realizing that it simply makes financial sense.”

GOe³’scoast-to-coast network of up to 1000 charging stations, powered by Eaton,over the next 3 years will allow cross-country travel via electric vehicles by 2015. Brimacombe sees Arizona as a key hub for the project’s initiation, home to branches of I-10, I-8, and I-40.

Focused on educating the public while the infrastructure is installed, GOe³’s next launch is a documentary film and reality television show that will involve and inform Americans on the future viability of Electric Vehicles.

ABOUT THE GRAND OPENING EVENT

Ÿ  Date:  Saturday, December 8, 2012 12 pm – 5 pm; Ribbon cutting at 2:30 pm

Ÿ  Location: Picacho Peak Plaza located on Interstate 10 (Exit 219) halfway between Phoenix and Tucson

Ÿ  Free and Open to the Public

Ÿ  Speakers include Secretary of State, Ken Bennett, and Reps from several Arizona cities and Clean Cities coalitions

Ÿ  Free test drives of electric cars and raffle prizes

Ÿ  Education on Electric Vehicles and GOe³ Charging Stations with Bruce Brimacombe, CEO of GOe³

Ÿ  Free family entertainment includes: Bouncy houses and face painters

###